Pradhan Mantri Gram Sadak Yojana (PMGSY)

The spirit and the objective of the Pradhan Mantri Gram Sadak Yojana (PMGSY) is to provide good all-weather road connectivity to unconnected Habitations.

Pradhan Mantri Gram Sadak Yojana (PMGSY)
Pradhan Mantri Gram Sadak Yojana (PMGSY)

Pradhan Mantri Gram Sadak Yojana (PMGSY)

The spirit and the objective of the Pradhan Mantri Gram Sadak Yojana (PMGSY) is to provide good all-weather road connectivity to unconnected Habitations.

Pradhan Mantri Gram Sadak Yojana Launch Date: Dec 25, 2000

Pradhan Mantri Gram Sadak Yojana

  1. Introduction
  2. PMGSY - Phase I
    1. Guiding Principles of PMGSY and Definitions
    2. Planning for Rural Roads
  3. PMGSY - Phase II
  4. Road Connectivity Project for Left Wing Extremism Area (RCPLWEA)
  5. PMGSY - Phase III
  6. Status of PMGSY

Introduction

Rural Road Connectivity is not only a key component of Rural Development by promoting access to economic and social services and thereby generating increased agricultural incomes and productive employment opportunities in India, it is also as a result, a key ingredient in ensuring sustainable poverty reduction.

Hence, Government launched the Pradhan Mantri Gram Sadak Yojana on 25th December, 2000 to provide all-weather access to unconnected habitations. The Ministry of Rural Development along with state governments is responsible for the implementation of PMGSY.

PMGSY - Phase I

PMGSY - Phase I was launched in December, 2000 as a 100 % centrally sponsored scheme with an objective to provide single all-weather road connectivity to eligible unconnected habitation of designated population size (500+ in plain areas and 250+ in North-East, hill, tribal and desert areas, 00 - 249 population in LWE districts as per Census, 2001) for overall socio-economic development of the areas.

Also, upgradation (to prescribed standards) of the existing roads in those Districts where all the eligible Habitations of the designated population size have been provided all-weather road connectivity was to be taken up. However, Upgradation is not central to the Programme. In Upgradation works, priority was to be given to Through Routes of the Rural Core Network, which carry more traffic.

Under the scheme, 1,35,436 habitations were targeted for providing road connectivity and 3.68 lakh km. for upgradation of existing rural roads (including 40 % renewal of rural roads to be funded by the States) in order to ensure full farm to market connectivity.

Guiding Principles of PMGSY and Definitions

  1. The spirit and the objective of the Pradhan Mantri Gram Sadak Yojana (PMGSY) is to provide good all-weather road connectivity to unconnected Habitations. A habitation which was earlier provided all-weather connectivity would not be eligible even if the present condition of the road is bad.
  2. The unit for this Programme is a Habitation and not a Revenue village or a Panchayat. A Habitation is a cluster of population, living in an area, the location of which does not change over time. Desam, Dhanis, Tolas, Majras, Hamlets etc. are commonly used terminology to describe the Habitations.
  3. An Unconnected Habitation is one with a population of designated size located at a distance of at least 500 metres or more (1.5 km of path distance in case of Hills) from an All-weather road or a connected Habitation.
  4. The population, as recorded in the Census 2001, shall be the basis for determining the population size of the Habitation. The population of all Habitations within a radius of 500 metres (1.5 km. of path distance in case of Hills) may be clubbed together for the purpose of determining the population size. This cluster approach would enable provision of connectivity to a larger number of Habitations, particularly in the Hill / mountainous areas.
  5. The eligible Unconnected Habitations are to be connected to nearby Habitations already connected by an All-weather road or to another existing All-weather road so that services (educational, health, marketing facilities etc.), which are not available in the unconnected Habitation, become available to the residents.
  6. A Core Network is that minimal Network of roads (routes) that is essential to provide Basic access to essential social and economic services to all eligible habitations in the selected areas through at least single all-weather road connectivity.
  7. A Core Network comprises of Through Routes and Link Routes. Through routes are the ones which collect traffic from several link roads or a long chain of Habitations and lead it to Marketing centres either directly or through the higher category roads i.e., the District Roads or the State or National Highway. Link Routes are the roads connecting a single Habitation or a group of Habitations to Through Routes or District Roads leading to Market Centres. Link routes generally have dead ends terminating on a Habitation, while Through Routes arise from the confluence of two or more Link Routes and emerge on to a major Road or to a Market Centre.
  8. It should be ensured that each road work that is taken up under the PMGSY is part of the Core Network. While keeping the objective of Connectivity in view, preference should be given to those roads which also incidentally serve other Habitations. In other words, without compromising the basic objective (covering 1000+ Habitations first and 500+ Habitations next and 250+ Habitations where eligible, last), preference should be given to those roads which serve a larger population. For this purpose, while Habitations within a distance of 500 metres from the road is considered as connected in case of plain areas, this distance should be 1.5 km (of path length) in respect of Hills.
  9. The PMGSY shall cover only the rural areas. Urban roads are excluded from the purview of this Programme. Even in the rural areas, PMGSY covers only the Rural Roads i.e., Roads that were formerly classified as ‘Other District Roads’ (ODR) and ‘Village Roads’ (VR). Other District Roads (ODR) are roads serving rural areas of production and providing them with outlet to market centres, taluka (tehsil) headquarters, Block headquarters or other main roads. Village Roads (VR) are roads connecting villages / Habitation or groups of Habitation with each other and to the nearest road of a higher category. Major District Roads, State Highways and National Highways cannot be covered under the PMGSY, even if they happen to be in rural areas. This applies to New Connectivity roads as well as Upgradation works.
  10. The PMGSY envisages only single road Connectivity to be provided. If a Habitation is already connected by way of an All-weather road, then no new work can be taken up under the PMGSY for that habitation.
  11. Provision of connectivity to unconnected Habitations would be termed as New Connectivity. Since the purpose of PMGSY inter alia is to provide farm to market access, new connectivity may involve ‘new construction’ where the link to the habitation is missing and additionally, if required, ‘Upgradation’ where an intermediate link in its present condition cannot function as an all-weather road
  12. Upgradation, when permitted would typically involve building the base and surface courses of an existing road to desired technical specifications and / or improving the geometrics of the road, as required in accordance with traffic condition.
  13. The primary focus of the PMGSY is to provide All-weather road connectivity to the eligible unconnected Habitations. An All-weather road is one which is negotiable in all seasons of the year. This implies that the road-bed is drained effectively (by adequate cross-drainage structures such as culverts, minor bridges and causeways), but this does not necessarily imply that it should be paved or surfaced or black-topped. Interruptions to traffic as per permitted frequency and duration may be allowed.
  14. There may be roads which are Fair-weather roads. In other words, they are fordable only during the dry season, because of lack of Cross Drainage (CD) works. Conversion of such roads to All-weather roads through provision of CD works would be treated as Upgradation. It must be noted that on all the road works of the PMGSY, provision of necessary CD works is considered an essential element
  15. PMGSY does not permit repairs to Black-topped or Cement Roads, even if the surface condition is bad.
  16. The Rural Roads constructed under the Pradhan Mantri Gram Sadak Yojana will be in accordance with the provision of the Indian Roads Congress (IRC) as given in the Rural Roads Manual (IRC:SP20:2002). In case of Hill Roads, for matters not covered by the Rural Roads Manual, provisions of Hills Roads Manual (IRC:SP:48) may apply.

Planning for Rural Roads

  • Proper planning is imperative to achieve the objectives of the Programme in a systematic and cost effective manner. The Manual for the Preparation of District Rural Roads Plan and the Core Network shall be treated as part of the Guidelines and would stand amended to the extent modified by the present Guidelines. The Manual lays down the various steps in the planning process and the role of different Agencies including the Intermediate Panchayat, the District Panchayat as well as the State Level Standing Committee. In the identification of the Core Network, the priorities of elected representatives, including MPs and MLAs, are expected to be duly taken into account and given full consideration. The Rural Roads Plan and the Core Network would constitute the basis for all planning exercises under the PMGSY.
  • The District Rural Roads Plan would indicate the entire existing road network system in the District and also clearly identify the proposed roads for providing connectivity to Unconnected Habitations, in an economic and efficient manner in terms of cost and utility. The Core Network will identify the roads required to assure each eligible Habitation with a Basic Access (single all-weather road connectivity) to essential social and economic services. Accordingly, the Core Network would consist of some of the existing roads as well as all the roads proposed for new construction under the PMGSY.
  • In proposing the new links under the District Rural Roads Plan, it would be first necessary to indicate the weightage for various services. The District Panchayat shall be the competent authority to select the set of socio-economic / infrastructure variables best suited for the District, categorise them and accord relative weightages to them. This would be communicated to all concerned before commencing the preparation of the District Rural Roads Plan.
  • The Plan would first be prepared at the Block level, in accordance with the directions contained in the Manual and the priorities spelt out by the District Panchayat. In short, the existing road network would be drawn up, unconnected Habitations identified and the roads required to connect these unconnected Habitations prepared. This shall constitute the Block Level Master Plan.
  • Once this exercise is completed, the Core Network for the Block is identified, by making best use of the existing and proposed road facilities in such a manner that all the eligible Habitations are assured of a Basic access. It must be ensured that every eligible Habitation is within 500 metres (1.5 km of Path length in the Hills) of a connected Habitation or an All-weather road (either existing or planned). In drawing up the proposed road links, the requirements of the people must be taken into account, through the socio-economic/infrastructure values (Road Index) suitably weighted and the alignment having the higher Road Index ought to be considered for selection.
  • The Block level Master Plan and the Core Network are then placed before the Intermediate Panchayat for consideration and approval of the Core Network. They are simultaneously sent, along with the list of all unconnected Habitations to the Members of Parliament and MLAs, for their comments, if any. After approval by the Intermediate Panchayat, the Plans would be placed before the District Panchayat for its approval. It will be incumbent on the District Panchayat to ensure that the suggestions given by the Members of Parliament are given full consideration within the framework of these Guidelines. Once approved by the District Panchayat, a copy of the Core Network would be sent to the State-level Agency as well as the National Rural Roads Development Agency. No road work may be proposed under the PMGSY for New Connectivity or Upgradation (where permitted) unless it forms part of the Core Network.

PMGSY - Phase II

The Phase II of PMGSY was approved during May, 2013. Under PMGSY phase II, the roads already built for village connectivity was to be upgraded to enhance rural infrastructure. For the 12th Five Year Plan period a target of 50,000 Km length under PMGSY-II. 75 per cent of the cost of the upgradation was by the Centre and 25 per cent by the state. For hill states, desert areas, Schedule V areas and Naxal-affected districts, 90 per cent of cost was borne by the Centre

The Cabinet Committee on Economic Affairs during November 2021 approved the continuation of Pradhan Mantri Gram Sadak Yojana-I and II upto September, 2022 for completion of balance road and bridge works. 

Road Connectivity Project for Left Wing Extremism Area (RCPLWEA)

Government launched Road Connectivity Project for Left Wing Extremism affected Areas in the year 2016 as a separate vertical under PMGSY to provide all-weather road connectivity with necessary culverts and cross-drainage structures in 44 districts (35 are worst LWE affected districts and 09 are adjoining districts), which are critical from security and communication point of view.

Under the project, construction/upgradation of 5,411.81 km road and 126 bridges/Cross Drainage works was targeted to be taken up at an estimated cost of Rs.11,724.53 crore in the above district. The fund sharing pattern of LWE road project is in the ratio of 60:40 between the Centre and States for all States except for eight North Eastern and three Himalayan States (Jammu & Kashmir, Himachal Pradesh & Uttarakhand) for which it is 90:10.

The Cabinet Committee on Economic Affairs  approved the continuation of Road Connectivity Project for Left Wing Extremism Affected Areas (RCPLWEA) upto March, 2023.

PMGSY - Phase III

The Phase III was approved by the Cabinet during July 2019. It involves consolidation of Through Routes and Major Rural Links connecting habitations to Gramin Agricultural Markets (GrAMs), Higher Secondary Schools and Hospitals. Under the PMGSY-III Scheme, it is proposed to consolidate 1,25,000 Km road length in the States. The duration of the scheme is 2019-20 to 2024-25.

The funds would be shared in the ratio of 60:40 between the Centre and State for all States except for 8 North Eastern and 3 Himalayan States (Jammu & Kashmir, Himachal Pradesh & Uttarakhand) for which it is 90:10.